Renewable energy projects near Dublin 22

Solar, wind and battery applications in the planning register for Dublin 22 and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

17
Projects here
13
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
179.0
Hectares of site area
across 17 applications

The map plots 17 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Dublin 22 Permission granted 13 Withdrawn 1 Permission lapsed 2 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Dublin 22

Permission granted Capacity not stated42.97 ha siteLodged Nov 15, 2017 Ref SD17A/0406
Grid: COOKSTOWN (110 kV), 1.29 km away. 14.2 MW of firm generation capacity available at BELGARD.

Solar — Dublin 22

Permission granted Capacity not stated16.23 ha siteLodged Feb 1, 2021 Ref SD20A/0283
Grid: CORKAGH (110 kV), 0.12 km away. 62.1 MW of firm generation capacity available at GRANGE CASTLE.

Solar — Dublin 22

Permission granted Capacity not stated16.23 ha siteLodged May 27, 2026 Ref SD20A/0283/EP
Grid: CORKAGH (110 kV), 0.12 km away. 62.1 MW of firm generation capacity available at GRANGE CASTLE.

Solar — Dublin 22

Permission granted Capacity not stated15.6 ha siteLodged Jun 9, 2025 Ref SDZ24A/0029W
Grid: BALGADDY (38 kV), 0.69 km away. 12.2 MW of firm generation capacity available at BALGADDY.

Grid infrastructure — Dublin 22

Permission granted Capacity not stated9.3 ha siteLodged Jun 26, 2006 Ref SD06A/0527
Grid: KILMAHUD (110 kV), 0.39 km away. 62.1 MW of firm generation capacity available at GRANGE CASTLE.

Solar — Dublin 22

Permission granted Capacity not stated5.18 ha siteLodged Oct 6, 2023 Ref SDZ22A/0018
Grid: CLONDALKIN (38 kV), 1.26 km away. 28 MW of firm generation capacity available at CLONDALKIN.

Solar — Dublin 22

Permission granted Capacity not stated4.87 ha siteLodged Dec 20, 2018 Ref SD18A/0447
Grid: CLONDALKIN (38 kV), 0.61 km away. 28 MW of firm generation capacity available at CLONDALKIN.

Wind — Dublin 22

Permission granted Capacity not stated4.519 ha siteLodged May 21, 2004 Ref SD03A/0838
Grid: YELLOWMEADOWS (110 kV), 0.47 km away. 28 MW of firm generation capacity available at CLONDALKIN.

Solar — Dublin 22

Permission granted Capacity not stated4.07 ha siteLodged Mar 23, 2020 Ref SD20A/0082
Grid: CORKAGH (110 kV), 0.5 km away. ESB Networks has not published available generation capacity for CORKAGH.

Solar — Dublin 22

Permission granted Capacity not stated3.228 ha siteLodged Jul 14, 2025 Ref SD25A/0097W
Grid: KILMAHUD (110 kV), 0.23 km away. 62.1 MW of firm generation capacity available at GRANGE CASTLE.

Solar — Dublin 22

Permission granted Capacity not stated2.65 ha siteLodged Feb 25, 2022 Ref SD21A/0186
Grid: BARNAKYLE (110 kV), 0.61 km away. 28 MW of firm generation capacity available at CLONDALKIN.

Solar — Dublin 22

Permission granted Capacity not stated2.32 ha siteLodged Mar 12, 2026 Ref SD25A/0301W
Grid: YELLOWMEADOWS (110 kV), 0.16 km away. 28 MW of firm generation capacity available at CLONDALKIN.

Battery storage — Dublin 22

Permission granted Capacity not stated0.08 ha siteLodged May 19, 2023 Ref SD23A/0035
Grid: BARNAKYLE (110 kV), 0.29 km away. ESB Networks has not published available generation capacity for BARNAKYLE.

Solar — Dublin 22

Withdrawn Capacity not stated34.55 ha siteLodged Dec 19, 2023 Ref SD23A/0331
Grid: KILMAHUD (110 kV), 1.55 km away. 62.1 MW of firm generation capacity available at GRANGE CASTLE.

Solar — Dublin 22

Permission lapsed Capacity not stated9.59 ha siteLodged Feb 12, 2021 Ref SD20A/0089
Grid: LIFFEY VALLEY (38 kV), 0.58 km away. 13.3 MW of firm generation capacity available at LIFFEY VALLEY.

Solar — Dublin 22

No decision recorded Capacity not stated3.816 ha siteLodged Jul 20, 2018 Ref SD18A/0262
Grid: BARNAKYLE (110 kV), 1.58 km away. ESB Networks has not published available generation capacity for BARNAKYLE.

Solar — Dublin 22

Permission lapsed Capacity not stated3.816 ha siteLodged Feb 13, 2019 Ref SD18A/0314
Grid: BARNAKYLE (110 kV), 1.58 km away. ESB Networks has not published available generation capacity for BARNAKYLE.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of South Dublin