Renewable energy projects near Carrick-On-Suir

Solar, wind and battery applications in the planning register for Carrick-On-Suir and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

9
Projects here
5
Still live
not refused, withdrawn or lapsed
7.2
MW stated
from 2 applications that state one
29.8
Hectares of site area
across 4 applications

The map plots 9 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Carrick-On-Suir Permission granted 5 No decision recorded 4

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage + Solar — Carrick-On-Suir

Permission granted 3.6 MW stated9.12 ha siteLodged Aug 23, 2017 Ref 17600928
Grid: DEERPARK (38 kV), 0.92 km away. 0.6 MW of firm generation capacity available at DEERPARK.

Battery storage + Solar — Carrick-On-Suir

Permission granted Capacity not stated9.12 ha siteLodged Dec 15, 2021 Ref 211819
Grid: DEERPARK (38 kV), 0.92 km away. 0.6 MW of firm generation capacity available at DEERPARK.

Solar — Carrick-On-Suir

Permission granted Capacity not stated2.47 ha siteLodged May 9, 2022 Ref 2260214
Grid: CREGG ROAD (38 kV), 1.24 km away. 2 MW of firm generation capacity available at CREGG ROAD.

Battery storage + Solar — Carrick-On-Suir

No decision recorded 3.6 MW stated9.12 ha siteLodged Jul 25, 2017 Ref 17600826
Grid: DEERPARK (38 kV), 0.99 km away. 0.6 MW of firm generation capacity available at DEERPARK.

Solar — Carrick-On-Suir

No decision recorded Capacity not statedLodged Sep 1, 2021 Ref 211312
Grid: DEERPARK (38 kV), 0.93 km away. 0.6 MW of firm generation capacity available at DEERPARK.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Tipperary