Solar, wind and battery applications in the planning register for
Hollyford and the townlands around it, with the nearest substation and the
capacity it has available. Last checked Sep 1, 2026.
7
Projects here
2
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
7.2
Hectares of site area
across 2 applications
The map plots 7 projects on a background supplied by
OpenStreetMap, which receives your IP address when it loads.
Planning status
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the
large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as
they move through planning, and which substations still have capacity to take a connection. If you
want to be told when something is lodged near your land, leave an email address.
No decision recordedCapacity not statedLodged Jul 7, 2021Ref 21980
Grid: MULTEEN (38 kV), 2.67 km away.
No firm generation capacity currently available at MULTEEN.