Renewable energy projects near Solloghod-More

Solar, wind and battery applications in the planning register for Solloghod-More and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

2
Projects here
1
Still live
not refused, withdrawn or lapsed
106.2
MW stated
from 2 applications that state one
131.5
Hectares of site area
across 2 applications

The map plots 2 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Solloghod-More Application submitted 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Solloghod-More

Application submitted 53.1 MW stated65.9 ha siteLodged Jul 10, 2026 Ref 2660672
Grid: CAUTEEN (110 kV), 1.05 km away. 8.1 MW of firm generation capacity available at CAUTEEN.

Solar — Solloghod-More

No decision recorded 53.1 MW stated65.6 ha siteLodged Feb 24, 2026 Ref 2660157
Grid: CAUTEEN (110 kV), 1.06 km away. 8.1 MW of firm generation capacity available at CAUTEEN.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Tipperary