Renewable energy projects near Decies-Without-Drum

Solar, wind and battery applications in the planning register for Decies-Without-Drum and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

2
Projects here
0
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
4.2
Hectares of site area
across 1 application

The map plots 2 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Decies-Without-Drum Permission lapsed 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage — Decies-Without-Drum

No decision recorded Capacity not stated4.16 ha siteLodged Jan 29, 2026 Ref 2660051
Grid: KILMACTHOMAS (38 kV), 5.01 km away. No firm generation capacity currently available at KILMACTHOMAS.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Waterford