Renewable energy projects near Castlepollard

Solar, wind and battery applications in the planning register for Castlepollard and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

5
Projects here
4
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
35.8
Hectares of site area
across 4 applications

The map plots 5 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Castlepollard Permission granted 4 Permission lapsed 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Castlepollard

Permission granted Capacity not stated16.96 ha siteLodged Feb 19, 2025 Ref 2560053
Grid: LOUGHANALLA (38 kV), 1.7 km away. No firm generation capacity currently available at LOUGHANALLA.

Solar — Castlepollard

Permission granted Capacity not stated15.6 ha siteLodged Jul 13, 2023 Ref 2360222
Grid: LOUGHANALLA (38 kV), 1.59 km away. No firm generation capacity currently available at LOUGHANALLA.

Solar — Castlepollard

Permission granted Capacity not stated3.24 ha siteLodged Apr 26, 2023 Ref 2360103
Grid: LOUGHANALLA (38 kV), 1.36 km away. No firm generation capacity currently available at LOUGHANALLA.

Solar — Castlepollard

Permission granted Capacity not stated0.043 ha siteLodged Jul 13, 2023 Ref 2360223
Grid: LOUGHANALLA (38 kV), 1.41 km away. No firm generation capacity currently available at LOUGHANALLA.

Solar — Castlepollard

Permission lapsed Capacity not statedLodged Dec 19, 2017 Ref 176361
Grid: LOUGHANALLA (38 kV), 1.58 km away. No firm generation capacity currently available at LOUGHANALLA.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Westmeath