Renewable energy projects near Ferns

Solar, wind and battery applications in the planning register for Ferns and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
4
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
145.4
Hectares of site area
across 6 applications

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Ferns Permission granted 4 No decision recorded 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Ferns

Permission granted Capacity not stated108.0 ha siteLodged Oct 5, 2022 Ref 20221309
Grid: LODGEWOOD (220 kV), 0.84 km away. No firm generation capacity currently available at CRORY.

Battery storage — Ferns

Permission granted Capacity not stated9.47 ha siteLodged Dec 13, 2024 Ref 20241558
Grid: CRORY (110 kV), 0.38 km away. ESB Networks has not published available generation capacity for LODGEWOOD.

Solar — Ferns

Permission granted Capacity not stated7.63 ha siteLodged Apr 8, 2024 Ref ABP-319499
Grid: CRANE (110 kV), 1.46 km away. No firm generation capacity currently available at FERNS.

Battery storage — Ferns

Permission granted Capacity not stated5.4 ha siteLodged Dec 19, 2024 Ref 20241593
Grid: CRORY (110 kV), 0.26 km away. No firm generation capacity currently available at CRORY.

Battery storage — Ferns

No decision recorded Capacity not stated9.47 ha siteLodged Dec 5, 2024 Ref 20241512
Grid: CRORY (110 kV), 0.38 km away. ESB Networks has not published available generation capacity for LODGEWOOD.

Battery storage — Ferns

No decision recorded Capacity not stated5.4 ha siteLodged Dec 12, 2024 Ref 20241546
Grid: CRORY (110 kV), 0.26 km away. No firm generation capacity currently available at CRORY.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.