Renewable energy projects near Killoughrum

Solar, wind and battery applications in the planning register for Killoughrum and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

5
Projects here
1
Still live
not refused, withdrawn or lapsed
100.0
MW stated
from 2 applications that state one
15.3
Hectares of site area
across 3 applications

The map plots 5 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Killoughrum Permission granted 1 Permission lapsed 1 No decision recorded 3

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Killoughrum

Permission granted Capacity not stated4.0 ha siteLodged Mar 24, 2022 Ref 20220383
Grid: BELLFIELD (38 kV), 2.69 km away. No firm generation capacity currently available at BELLFIELD.

Solar — Killoughrum

No decision recorded Capacity not stated7.3 ha siteLodged Jun 2, 2026 Ref 20260708
Grid: BELLFIELD (38 kV), 2.67 km away. No firm generation capacity currently available at BELLFIELD.

Solar — Killoughrum

No decision recorded Capacity not stated4.0 ha siteLodged Mar 9, 2022 Ref 20220291
Grid: BELLFIELD (38 kV), 2.69 km away. No firm generation capacity currently available at BELLFIELD.

Solar — Killoughrum

No decision recorded 50.0 MW statedLodged Dec 7, 2017 Ref 20171608
Grid: BELLFIELD (38 kV), 3.79 km away. No firm generation capacity currently available at BELLFIELD.

Solar — Killoughrum

Permission lapsed 50.0 MW statedLodged Dec 11, 2017 Ref 20171630
Grid: BELLFIELD (38 kV), 3.79 km away. No firm generation capacity currently available at BELLFIELD.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.