Renewable energy projects near Blessington

Solar, wind and battery applications in the planning register for Blessington and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

5
Projects here
2
Still live
not refused, withdrawn or lapsed
15.0
MW stated
from 1 application that state one
119.1
Hectares of site area
across 5 applications

The map plots 5 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Blessington Permission granted 2 Permission lapsed 1 No decision recorded 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Blessington

Permission granted Capacity not stated28.0 ha siteLodged May 8, 2024 Ref 2460257
Grid: BLESSINGTON (38 kV), 2.26 km away. 5.1 MW of firm generation capacity available at BLESSINGTON.

Solar — Blessington

Permission granted 15.0 MW stated21.04 ha siteLodged Oct 14, 2021 Ref 211237
Grid: BLESSINGTON (38 kV), 2.28 km away. 5.1 MW of firm generation capacity available at BLESSINGTON.

Solar — Blessington

No decision recorded Capacity not stated28.0 ha siteLodged Mar 28, 2024 Ref 2460186
Grid: BLESSINGTON (38 kV), 2.31 km away. 5.1 MW of firm generation capacity available at BLESSINGTON.

Solar — Blessington

No decision recorded Capacity not stated21.04 ha siteLodged Jul 20, 2017 Ref 17890
Grid: BLESSINGTON (38 kV), 2.22 km away. 5.1 MW of firm generation capacity available at BLESSINGTON.

Solar — Blessington

Permission lapsed Capacity not stated21.04 ha siteLodged Jul 26, 2017 Ref 17908
Grid: BLESSINGTON (38 kV), 2.28 km away. 5.1 MW of firm generation capacity available at BLESSINGTON.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Wicklow