Solar, wind and battery applications in the planning register for
Donegal Po and the townlands around it, with the nearest substation and the
capacity it has available. Last checked Sep 1, 2026.
12
Projects here
4
Still live
not refused, withdrawn or lapsed
15.2
MW stated
from 3 applications that state one
184.2
Hectares of site area
across 12 applications
The map plots 12 projects on a background supplied by
OpenStreetMap, which receives your IP address when it loads.
Planning status
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the
large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as
they move through planning, and which substations still have capacity to take a connection. If you
want to be told when something is lodged near your land, leave an email address.
Permission lapsedCapacity not stated0.145 ha siteLodged Mar 22, 2019Ref 1950390
Grid: GOLAGH (110 kV), 1.09 km away.
ESB Networks has not published available generation capacity for CLOGHER.
Areas are derived from the address as published by the planning authority
or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two
places may appear under either.