Renewable energy projects near Dublin 4

Solar, wind and battery applications in the planning register for Dublin 4 and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

8
Projects here
6
Still live
not refused, withdrawn or lapsed
105.0
MW stated
from 2 applications that state one
54.6
Hectares of site area
across 8 applications

The map plots 8 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Dublin 4 Permission granted 6 Permission refused 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Dublin 4

Permission granted Capacity not stated15.06 ha siteLodged May 31, 2024 Ref PWSDZ3798/24
Grid: RINGSEND (110 kV), 0.46 km away. 29.4 MW of firm generation capacity available at RINGSEND.

Solar — Dublin 4

Permission granted Capacity not stated5.4873 ha siteLodged Mar 10, 2022 Ref 3496/22
Grid: NUTLEY LANE (110 kV), 0.25 km away. ESB Networks has not published available generation capacity for NUTLEY LANE.

Battery storage + Wind — Dublin 4

Permission granted 75.0 MW stated5.328181 ha siteLodged Oct 23, 2020 Ref 3625/20
Grid: SHELLYBANKS (220 kV), 0.07 km away. 281.1 MW of firm generation capacity available at POOLBEG.

Solar — Dublin 4

Permission granted Capacity not stated4.26 ha siteLodged Jun 12, 2023 Ref 3937/23
Grid: SERPENTINE AVENUE (38 kV), 0.58 km away. ESB Networks has not published available generation capacity for SERPENTINE AVENUE.

Battery storage — Dublin 4

Permission granted 30.0 MW stated3.516806 ha siteLodged Oct 29, 2020 Ref 3646/20
Grid: IRISHTOWN (220 kV), 0.18 km away. ESB Networks has not published available generation capacity for IRISHTOWN.

Solar — Dublin 4

Permission granted Capacity not stated2.9328 ha siteLodged Jun 21, 2024 Ref 3886/24
Grid: NUTLEY LANE (110 kV), 0.6 km away. 14.7 MW of firm generation capacity available at MERRION SQUARE.

Solar — Dublin 4

Permission refused Capacity not stated15.06 ha siteLodged Jul 1, 2022 Ref PWSDZ4380/22
Grid: RINGSEND (110 kV), 0.46 km away. 281.1 MW of firm generation capacity available at POOLBEG.

Solar — Dublin 4

No decision recorded Capacity not stated2.9328 ha siteLodged Jun 17, 2024 Ref 3866/24
Grid: NUTLEY LANE (110 kV), 0.6 km away. 14.7 MW of firm generation capacity available at MERRION SQUARE.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.