Renewable energy projects near Celbridge

Solar, wind and battery applications in the planning register for Celbridge and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
3
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
139.1
Hectares of site area
across 5 applications

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Celbridge Permission granted 3 Permission lapsed 2 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Celbridge

Permission granted Capacity not stated47.44 ha siteLodged Jul 14, 2023 Ref 2360037
Grid: GRIFFINRATH (110 kV), 1.46 km away. 2.6 MW of firm generation capacity available at CELBRIDGE.

Solar — Celbridge

Permission granted Capacity not stated44.21 ha siteLodged Sep 2, 2021 Ref 211256
Grid: GRIFFINRATH (110 kV), 0.67 km away. 2.6 MW of firm generation capacity available at GRIFFINRATH.

Solar — Celbridge

Permission granted Capacity not stated0.01 ha siteLodged Jul 24, 2023 Ref 2360062
Grid: GRIFFINRATH (110 kV), 1.21 km away. 2.6 MW of firm generation capacity available at CELBRIDGE.

Solar — Celbridge

Permission lapsed Capacity not stated47.44 ha siteLodged Mar 12, 2018 Ref 18250
Grid: GRIFFINRATH (110 kV), 1.49 km away. 2.6 MW of firm generation capacity available at CELBRIDGE.

Solar — Celbridge

No decision recorded Capacity not stated0.01 ha siteLodged Jul 14, 2023 Ref 2360042
Grid: GRIFFINRATH (110 kV), 1.2 km away. 2.6 MW of firm generation capacity available at CELBRIDGE.

Solar — Celbridge

Permission lapsed Capacity not statedLodged Sep 11, 2024 Ref 24291
Grid: GRIFFINRATH (110 kV), 1.47 km away. 2.6 MW of firm generation capacity available at CELBRIDGE.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Kildare