Renewable energy projects near Rhode

Solar, wind and battery applications in the planning register for Rhode and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

13
Projects here
7
Still live
not refused, withdrawn or lapsed
20.0
MW stated
from 1 application that state one
358.2
Hectares of site area
across 12 applications

The map plots 13 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Rhode Permission granted 7 Withdrawn 1 Permission lapsed 3 No decision recorded 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage + Solar — Rhode

Permission granted Capacity not stated137.0 ha siteLodged Mar 20, 2025 Ref 2560082
Grid: DERRYIRON (110 kV), 2.72 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Battery storage + Solar — Rhode

Permission granted Capacity not stated132.0 ha siteLodged Oct 13, 2020 Ref 20494
Grid: DERRYIRON (110 kV), 2.73 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Solar — Rhode

Permission granted Capacity not stated24.0 ha siteLodged Mar 20, 2025 Ref 2560083
Grid: DERRYIRON (110 kV), 2.73 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Battery storage + Solar — Rhode

Permission granted Capacity not stated22.92 ha siteLodged Aug 6, 2021 Ref 21488
Grid: DERRYIRON (110 kV), 2.73 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Solar — Rhode

Permission granted Capacity not stated15.0 ha siteLodged Apr 30, 2019 Ref 19194
Grid: DERRYIRON (110 kV), 1 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Battery storage — Rhode

Permission granted Capacity not stated2.7 ha siteLodged Jun 23, 2020 Ref 20238
Grid: DERRYIRON (110 kV), 0.17 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Battery storage — Rhode

Permission granted Capacity not statedLodged May 27, 2026 Ref EX26009
Grid: DERRYIRON (110 kV), 0.17 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Solar — Rhode

No decision recorded Capacity not stated15.0 ha siteLodged Apr 9, 2019 Ref 19156
Grid: DERRYIRON (110 kV), 1 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Wind — Rhode

Withdrawn Capacity not stated4.6 ha siteLodged Sep 17, 2019 Ref 19455
Grid: DERRYIRON (110 kV), 4.32 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Grid infrastructure — Rhode

Permission lapsed Capacity not stated2.45 ha siteLodged Jun 23, 2020 Ref 20237
Grid: DERRYIRON (110 kV), 0.32 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Battery storage — Rhode

Permission lapsed 20.0 MW stated0.95 ha siteLodged Apr 10, 2019 Ref 19161
Grid: DERRYIRON (110 kV), 0.1 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Wind — Rhode

Permission lapsed Capacity not stated0.8 ha siteLodged Apr 17, 2019 Ref 19176
Grid: DERRYIRON (110 kV), 4.52 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Wind — Rhode

No decision recorded Capacity not stated0.8 ha siteLodged Oct 24, 2025 Ref 2560515
Grid: DERRYIRON (110 kV), 4.52 km away. ESB Networks has not published available generation capacity for DERRYIRON.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Offaly