Battery storage + Solar at Cappoquin

Drumroe , Cappoquin , Co Waterford

Withdrawn
Planning status
Not stated
Capacity
the application states no figure in MW
43.9
Site area (hectares)
Battery storage + Solar
Technology

Grid

Nearest substation: KILCLOHER (38 kV), 1.01 km away.
Association: Nothing states a connection point and the place name does not match a station, but KILCLOHER is only 1.01 km away — close enough that it is usually, though not always, where a project like this connects. Counted separately from the match rate.
Available capacity: No firm generation capacity currently available at KILCLOHER.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJun 17, 2020
Further information requestedAug 7, 2020
WithdrawnMar 10, 2021
DecisionN/A

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Waterford City and County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.