Renewable energy projects near Cappoquin

Solar, wind and battery applications in the planning register for Cappoquin and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
0
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
479.6
Hectares of site area
across 6 applications

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Cappoquin Withdrawn 2 Permission lapsed 2 No decision recorded 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Cappoquin

No decision recorded Capacity not stated149.1 ha siteLodged Jun 12, 2026 Ref 2660420
Grid: KILCLOHER (38 kV), 0.76 km away. No firm generation capacity currently available at KILCLOHER.

Solar — Cappoquin

No decision recorded Capacity not stated149.1 ha siteLodged Jun 25, 2026 Ref 2660471
Grid: KILCLOHER (38 kV), 0.76 km away. No firm generation capacity currently available at KILCLOHER.

Solar — Cappoquin

Permission lapsed Capacity not stated62.8 ha siteLodged Aug 4, 2017 Ref 17564
Grid: KILCLOHER (38 kV), 1.11 km away. No firm generation capacity currently available at KILCLOHER.

Battery storage + Solar — Cappoquin

Withdrawn Capacity not stated45.0 ha siteLodged Mar 5, 2020 Ref 20133
Grid: KILCLOHER (38 kV), 1 km away. No firm generation capacity currently available at KILCLOHER.

Battery storage + Solar — Cappoquin

Withdrawn Capacity not stated43.9 ha siteLodged Jun 17, 2020 Ref 20357
Grid: KILCLOHER (38 kV), 1.01 km away. No firm generation capacity currently available at KILCLOHER.

Solar — Cappoquin

Permission lapsed Capacity not stated29.7 ha siteLodged Sep 3, 2018 Ref 18598
Grid: KILCLOHER (38 kV), 3.02 km away. No firm generation capacity currently available at KILCLOHER.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Waterford