Solar at Dunleer

Drumcar Road , Dunleer , Co Louth

Permission granted
Planning status
4.0
Capacity
as stated in the application
Not published
Site area (hectares)
Solar
Technology

Grid

Nearest substation: DUNLEER (38 kV), 0.66 km away.
Association: Matched to DUNLEER on place name and proximity (0.66 km).
Available capacity: 0.1 MW of firm generation capacity available at DUNLEER.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedDec 18, 2023
Further information requestedFeb 9, 2024
Further information receivedAug 1, 2024
Decision dueAug 28, 2024
Decision madeAug 15, 2024
Permission grantedSep 16, 2024
Permission expiresSep 15, 2029
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Louth County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.