Renewable energy projects near Thurles

Solar, wind and battery applications in the planning register for Thurles and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

10
Projects here
4
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
190.7
Hectares of site area
across 10 applications

The map plots 10 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Thurles Permission granted 4 Withdrawn 2 Permission lapsed 3 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Thurles

Permission granted Capacity not stated9.3 ha siteLodged Dec 21, 2022 Ref 2260732
Grid: HOLYCROSS ROAD (38 kV), 0.53 km away. No firm generation capacity currently available at HOLYCROSS ROAD.

Battery storage + Solar — Thurles

Permission granted Capacity not stated3.75 ha siteLodged Nov 14, 2024 Ref 2460978
Grid: LISHEEN (110 kV), 0.41 km away. 20.5 MW of firm generation capacity available at LISHEEN.

Solar — Thurles

Permission granted Capacity not stated3.409 ha siteLodged Apr 28, 2023 Ref 2360281
Grid: LISHEEN (110 kV), 0.35 km away. 20.5 MW of firm generation capacity available at LISHEEN.

Battery storage — Thurles

Permission granted Capacity not stated2.69 ha siteLodged Sep 22, 2025 Ref 2560940
Grid: THURLES (110 kV), 0.16 km away. No firm generation capacity currently available at THURLES.

Solar — Thurles

Withdrawn Capacity not stated38.3 ha siteLodged Dec 7, 2018 Ref 18601447
Grid: THURLES (110 kV), 1.91 km away. No firm generation capacity currently available at THURLES.

Solar — Thurles

Permission lapsed Capacity not stated38.3 ha siteLodged Sep 12, 2019 Ref 19601012
Grid: THURLES (110 kV), 1.91 km away. No firm generation capacity currently available at THURLES.

Solar — Thurles

Withdrawn Capacity not stated37.6 ha siteLodged Dec 7, 2018 Ref 18601446
Grid: HOLYCROSS ROAD (38 kV), 1.82 km away. No firm generation capacity currently available at THURLES.

Solar — Thurles

Permission lapsed Capacity not stated37.6 ha siteLodged Oct 21, 2019 Ref 19601159
Grid: HOLYCROSS ROAD (38 kV), 1.82 km away. No firm generation capacity currently available at THURLES.

Solar — Thurles

Permission lapsed Capacity not stated17.06 ha siteLodged May 19, 2021 Ref 21709
Grid: LISHEEN (110 kV), 1.24 km away. 20.5 MW of firm generation capacity available at LISHEEN.

Battery storage — Thurles

No decision recorded Capacity not stated2.69 ha siteLodged Aug 29, 2025 Ref 2560848
Grid: THURLES (110 kV), 0.15 km away. No firm generation capacity currently available at THURLES.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Tipperary