Renewable energy projects near Rosslare

Solar, wind and battery applications in the planning register for Rosslare and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
0
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
42.8
Hectares of site area
across 3 applications

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Rosslare Permission refused 1 Permission lapsed 5

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Rosslare

Permission lapsed Capacity not stated22.75 ha siteLodged Jun 10, 2016 Ref 20160644
Grid: KILLINICK (38 kV), 1.76 km away. 2.7 MW of firm generation capacity available at KILLINICK.

Solar — Rosslare

Permission lapsed Capacity not stated10.0 ha siteLodged May 17, 2016 Ref 20160520
Grid: KILLINICK (38 kV), 1.04 km away. 2.7 MW of firm generation capacity available at KILLINICK.

Solar — Rosslare

Permission lapsed Capacity not stated10.0 ha siteLodged May 24, 2021 Ref 20210793
Grid: KILLINICK (38 kV), 1.04 km away. 2.7 MW of firm generation capacity available at KILLINICK.

Solar — Rosslare

Permission lapsed Capacity not statedLodged Jan 8, 2016 Ref 20160008
Grid: KILLINICK (38 kV), 1.4 km away. 2.7 MW of firm generation capacity available at KILLINICK.

Solar — Rosslare

Permission lapsed Capacity not statedLodged Jan 8, 2016 Ref 20160009
Grid: KILLINICK (38 kV), 1.45 km away. 2.7 MW of firm generation capacity available at KILLINICK.

Solar — Rosslare

Permission refused Capacity not statedLodged Oct 4, 2016 Ref 20161096
Grid: KILLINICK (38 kV), 0.21 km away. 2.7 MW of firm generation capacity available at KILLINICK.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Wexford